The Pennsylvania State Employees Credit Union Corporate Headquarters
     
sarah j wujcik | lighting + electrical  
       
thesis final report   executive summary posted 4.04.2012  
       
    full report posted 04.04.2012  
       
    appendices only posted 04.04.2012  

this page was last updated on 09/09/2011, by sarah wujcik and is hosted by the ae department© 2011

note: While great efforts have been taken to provide accurate and complete information on the pages of cpep, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of sarah wujcik. Changes and discrepancies in no way imply that the original designed contained errors or was flawed. Different assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.